Close Menu
Trade Verdict
  • Home
  • Latest News
  • Investing
  • Personal Finance
  • Retirement
  • Economy
  • Stocks
  • Bonds
  • Commodities
  • Cryptocurrencies

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

21Shares updates spot Dogecoin ETF submitting with payment particulars

December 3, 2025

Shopper Problem

December 3, 2025

Prismo Metals Proclaims Assay & IP Outcomes at Silver King

December 3, 2025
Facebook X (Twitter) Instagram
Trade Verdict
  • Latest News
  • Investing
  • Personal Finance
  • Retirement
  • Economy
Facebook X (Twitter) Instagram
Trade Verdict
Home»Investing»Q2 Metals Intercepts 457.4 metres of 1.65% Li?O in Drill Gap 44 on the Cisco Lithium Challenge
Investing

Q2 Metals Intercepts 457.4 metres of 1.65% Li?O in Drill Gap 44 on the Cisco Lithium Challenge

EditorialBy EditorialDecember 3, 2025No Comments10 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Q2 Metals Intercepts 457.4 metres of 1.65% Li?O in Drill Gap 44 on the Cisco Lithium Challenge
Share
Facebook Twitter LinkedIn Pinterest Email


Highlights:

  • CS25-044 : Two (2) separate intervals, together with 457.4 metres (“m”) at 1.65% Li 2 O and 36.9 m at 1.65% Li 2 O .
  • Drill gap CS25-044 is the widest steady spodumene pegmatite interval drilled by Q2 to this point .
  • Infill drilling for incorporation into the preliminary Mineral Useful resource Estimate on the Cisco Lithium Challenge, anticipated in Q1 2026, might be accomplished within the coming weeks.
  • The 4 (4) drill rigs at the moment working on the Cisco Lithium Challenge will pause mid-December and resume in early January.

Q2 Metals Corp. (TSX.V: QTWO | OTCQB: QUEXF | FSE: 458) (” Q2 ” or the ” Firm “) is happy to report analytical outcomes from the continuing 2025 drill program (the ” 2025 Drill Program “) on the Firm’s Cisco Lithium Challenge (the ” Challenge ” or the ” Cisco Challenge “), positioned throughout the larger Nemaska conventional territory of the Eeyou Istchee James Bay area of Quebec, Canada.

” Drill gap 44 additional showcases the Cisco Challenge as a globally important exhausting rock lithium discovery. The outcomes to this point will underpin the inaugural Mineral Useful resource Estimate, which we count on to announce within the first quarter of 2026, as we proceed to advance Cisco,” mentioned Alicia Milne, President and CEO for Q2 Metals. “I’m proud and grateful for the tireless efforts of our workforce which have enabled us to persistently obtain the targets, and milestone targets we publicly set for the Firm. ”

“The standout consequence from our drilling to this point has clearly been drill gap 44. Not solely did gap 44 have extraordinary width and grade but it surely has important intervals occurring outdoors the beforehand outlined bounds of the mineralized zone outlined by the Exploration Goal (“ET”),” mentioned Neil McCallum, Vice President of Exploration for Q2 Metals. ” Given our success on the drill bit to this point, we’re very excited for subsequent assay outcomes, notably from holes CS25-063 and CS25-065, which additionally intercepted important mineralization outdoors the ET boundaries and additional broaden and outline Cisco’s already spectacular footprint. ”

The analytical outcomes reported herein signify 2,200.4 m of drilling over 4 (4) drill holes accomplished throughout the 2025 Drill Program. Pegmatite intervals and analytical outcomes from the present program might be reported as they’re obtained and reviewed.

Determine 1. Map of Current Drill Holes with Analytical Outcomes at Cisco Property

Figure 2. Cross-Section C

Determine 2. Cross-Part C

Table 1. Summary of Analytical Results of Drill Holes CS25-044, 045, 046 and 047 at Cisco Project

Desk 1. Abstract of Analytical Outcomes of Drill Holes CS25-044, 045, 046 and 047 at Cisco Challenge

All intervals of larger than 2 m of core-length and larger than 0.30% Li 2 O are included in Desk 1. Inner dilution of non-pegmatite materials was restricted to intervals of lower than 3 m. No particular grade cap or decrease cut-offs have been used throughout grade and width calculations. All intervals are reported as core widths and mineralized intervals in all of the holes drilled up to now are usually not consultant of the true width because the modelled pegmatite zones are being refined with each further gap.

Drill Gap Collar Data

The abstract of drill holes CS25-044 to CS25-047 together with primary location and dip/azimuth, is detailed under (Desk 2).

Table 2. Summary of Drill Hole Collar Information, Cisco Project (CS25-044 to CS25-047)

Desk 2. Abstract of Drill Gap Collar Data, Cisco Challenge (CS25-044 to CS25-047)

The first focus of the autumn and winter drilling marketing campaign is on infill-scale drilling inside the primary mineralized zone outlined by the ET (the “Mineralized Zone”), issued by the Firm in July 2025. The Exploration Goal estimated a spread of potential lithium mineralization on the Mineralized Zone of 215 to 329 million tonnes at a grade starting from 1.0 to 1.38% Li 2 O and was primarily based solely on the primary 40 holes drilled. An Exploration Goal is used to supply a conceptual estimate of the potential amount and grade of a mineral deposit, primarily based on recognized and extra restricted geological proof. It’s an early-stage evaluation that can assist to information additional exploration, however it isn’t a mineral useful resource or mineral reserve and shouldn’t be handled as such.

The drill marketing campaign has been designed to assist the Firm’s goal of delivering an preliminary inferred Mineral Useful resource Estimate within the first quarter of 2026. Drilling on the Cisco Challenge is ongoing, with 4 (4) drill rigs at the moment working on website.

Upcoming Occasions

Members of the Q2 workforce are at the moment attending the Mines & Cash Resourcing Tomorrow (Sales space D35) convention being held in London, UK from December 2-4, 2025.

Sampling, Analytical Strategies and QA/QC Protocols

All drilling was performed utilizing diamond drill rig with NQ sized core and all drill core samples are shipped to SGS Canada’s preparation facility in Val D’Or, Quebec, for normal pattern preparation (code PRP92) which incorporates drying at 105°C, crushing to 90% passing 2 mm, riffle break up 500 g, and pulverize 85% passing 75 microns. The pulps are then shipped by air to SGS Canada’s laboratory in Burnaby, BC, the place the samples are homogenized and subsequently analyzed for multi-element (together with Li and Ta) utilizing sodium peroxide fusion with ICP-AES/MS end (code GE_ICM91A50). The reported Li grade might be multiplied by the usual conversion issue of two.153 which ends up in an equal Li 2 O grade. Drill core was saw-cut with half-core despatched for geochemical evaluation and half-core remaining within the field for reference. The identical facet of the core was sampled to take care of representativeness.

A High quality Assurance / High quality Management (QA/QC) protocol following business greatest practices was integrated into the sampling program. Measures embrace the systematic insertion of quartz blanks and authorized reference supplies (CRMs) into pattern batches at a charge of roughly 5% every. Moreover, evaluation of pulp-split and reject-split duplicates was accomplished to evaluate analytical precision. The QP has verified the QA/QC outcomes of the analytical work.

Certified Particular person

Neil McCallum, B.Sc., P.Geol, is a Certified Particular person as outlined by NI 43-101, and a registered allow holder with the Ordre des Géologues du Québec and member in good standing with the Skilled Geoscientists of Ontario. Mr. McCallum has reviewed and authorized the technical info on this information launch. Mr. McCallum is a director and the Vice President Exploration for Q2.

ABOUT Q2 Metals Corp.

Q2 Metals is a Canadian mineral exploration firm centered on the Cisco Lithium Challenge which is positioned throughout the larger Nemaska conventional territory of the Eeyou Istchee, James Bay area of Quebec, Canada. The recognized mineralized zone at Cisco is simply 6.5 km from the Billy Diamond Freeway, which results in the railhead within the City of Matagami, roughly 150 km to the south.

The Cisco Challenge has district-scale potential with an preliminary Exploration Goal estimating a spread of potential lithium mineralization of 215 to 329 million tonnes at a grade starting from 1.0 to 1.38% Li 2 O, primarily based solely on the primary 40 holes drilled. It’s famous that the potential amount and grade of the Exploration Goal are conceptual in nature and there was inadequate exploration to estimate and outline a Mineral Useful resource, as outlined by NI 43-101. It’s unsure if additional exploration will consequence within the goal being delineated as a Mineral Useful resource.

The 2025 Exploration Program is ongoing, prioritizing infill drilling in direction of an preliminary mineral useful resource estimate anticipated in Q1 2026. Growth and exploration drilling continues on the important zone, which stays open at depth and alongside strike, in addition to at excessive potential targets recognized throughout the broader 41,253 hectare venture space.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Phone:  1 (800) 482-7560

E-mail: information@Q2metals.com
www.Q2Metals.com

Social Media:
Observe the Firm: Twitter , LinkedIn , Fb , and Instagram

Ahead-Trying Statements

This information launch comprises forward-looking statements and forward-looking info (collectively, “forward-looking statements”) throughout the that means of relevant Canadian laws. Ahead-looking statements are sometimes recognized by phrases equivalent to: “believes”, “expects”, “anticipates”, “intends”, “estimates”, “plans”, “might”, “ought to”, “would”, “will”, “potential”, “scheduled” or variations of such phrases and phrases and comparable expressions, which, by their nature, consult with future occasions or outcomes which will, may, would, would possibly or will happen or be taken or achieved. Accordingly, all statements on this information launch that aren’t purely historic are forward-looking statements and embrace statements relating to beliefs, plans, expectations and orientations relating to the long run together with, with out limitation, any statements or plans regard the geological prospects of the Firm’s properties and the long run exploration endeavors of the Firm. Though the Firm believes the expectations expressed in such forward-looking statements are primarily based on affordable assumptions, such statements are usually not ensures of future efficiency and precise outcomes or developments might differ materially from these within the forward-looking statements. Ahead-looking statements are primarily based on quite a lot of materials components and assumptions.

Ahead-looking statements contain recognized and unknown dangers, uncertainties and different components which will trigger precise outcomes to vary materially from these anticipated in such forward-looking statements. The forward-looking statements on this information launch communicate solely as of the date of this information launch or as of the date laid out in such assertion. Ahead wanting statements on this information launch embrace, however are usually not restricted to, drilling outcomes on the Cisco Challenge and inferences made therefrom, the conceptual nature of an exploration goal on the Cisco Challenge, the potential scale of the Cisco Challenge, the main target of the Firm’s present and future exploration and drill applications, the size, scope and placement of future exploration and drilling actions, the Firm’s expectations in reference to the tasks and exploration applications being met, the Firm’s goals, targets or future plans, statements, exploration outcomes, potential mineralization, the estimation of mineral sources, exploration and mine growth plans, timing of the graduation of operations and estimates of market circumstances. Elements that might trigger precise outcomes to vary materially from these in forward-looking statements embrace failure to acquire mandatory approvals, variations in ore grade or restoration charges, modifications in venture parameters as plans proceed to be refined, unsuccessful exploration outcomes, modifications in venture parameters as plans proceed to be refined, outcomes of future useful resource estimates, future steel costs, availability of capital and financing on acceptable phrases, reallocation of proposed use of funds, common financial, market or enterprise circumstances, dangers related to regulatory modifications, defects in title, availability of personnel, supplies and tools on a well timed foundation, accidents or tools breakdowns, uninsured dangers, delays in receiving authorities approvals, unanticipated environmental impacts on operations and prices to treatment similar. Readers are cautioned that mineral exploration and growth of mines is an inherently dangerous enterprise and accordingly, the precise occasions might differ materially from these projected within the forward-looking statements. Extra danger components are mentioned within the part entitled “Threat Elements” within the Firm’s Administration Dialogue and Evaluation for its not too long ago accomplished fiscal interval, which is obtainable beneath Firm’s SEDAR profile at www.sedarplus.com .

Ought to a number of of those dangers or uncertainties materialize, or ought to assumptions underlying the forward-looking statements show incorrect, precise outcomes might differ materially from these described herein as meant, deliberate, anticipated, believed, estimated or anticipated. Though the Firm has tried to determine essential dangers, uncertainties and components which may trigger precise outcomes to vary materially, there could also be others that trigger outcomes to not be as anticipated, estimated or meant. The Firm doesn’t intend, and doesn’t assume any obligation, to replace this forward-looking info besides as in any other case required by relevant regulation.

Neither the TSX Enterprise Trade nor its Regulation Providers Supplier (as that time period is outlined within the insurance policies of the TSX Enterprise Trade) accepts duty for the adequacy or accuracy of this launch.

Images accompanying this announcement can be found at

https://www.globenewswire.com/NewsRoom/AttachmentNg/09e6b2ee-3545-4317-9673-e07a8ca4732b
https://www.globenewswire.com/NewsRoom/AttachmentNg/ddf4d5b2-5801-4f0c-98b0-90d30cce4f7a
https://www.globenewswire.com/NewsRoom/AttachmentNg/6a6f15b2-8450-4c91-974f-0a4259f026e3
https://www.globenewswire.com/NewsRoom/AttachmentNg/3b11d507-de38-42ab-8eed-ee86e53220ce

Primary Logo



Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Editorial
  • Website

Related Posts

Prismo Metals Proclaims Assay & IP Outcomes at Silver King

December 3, 2025

Big Mining Corp. Advances Metallurgical Check Work at Majuba Hill Nevada Copper-Silver-Gold Venture as Steel Costs Hit Data

December 3, 2025

Goldgroup Mining: Advancing Three Excessive-quality Property in Mexico

December 3, 2025

Drilling Confirms Continuity of Larger-Grade Copper

December 3, 2025
Add A Comment
Leave A Reply Cancel Reply

Trending Posts

21Shares updates spot Dogecoin ETF submitting with payment particulars

December 3, 2025

Shopper Problem

December 3, 2025

Prismo Metals Proclaims Assay & IP Outcomes at Silver King

December 3, 2025

Russia prepared for struggle with Europe, Putin says, earlier than Ukraine peace talks

December 3, 2025
More News
Investing

Prismo Metals Proclaims Assay & IP Outcomes at Silver King

By Editorial
Investing

Big Mining Corp. Advances Metallurgical Check Work at Majuba Hill Nevada Copper-Silver-Gold Venture as Steel Costs Hit Data

By Editorial
Investing

Goldgroup Mining: Advancing Three Excessive-quality Property in Mexico

By Editorial
Trade Verdict
Facebook X (Twitter) Instagram Pinterest
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms Of Service
© 2025 Trade Verdict. All rights reserved by Trade Verdict.

Type above and press Enter to search. Press Esc to cancel.